Cisco Systems RF Gateway 10 Quick Start Guide Page 29

  • Download
  • Add to my manuals
  • Print
  • Page
    / 40
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 28
29
Figure 22 DC PEM LEDs
Note With both the DC PEMs installed, both need to be operating with breaker switches on and OUTPUT OK LED on. If
one PEM is not operational, it is recommended that either the PEM be removed from the system or the power input
cables be removed to limit power supply Conductive Emissions (FCC conductive Emission Requirements).
When the power-on sequence is complete, the supervisor card begins to initialize the line cards.
1
DC PEM captive screws
5
Fan
2
DC PEM On (|) /Off (O) switch
6
DC PEM handle
3
Earth grounding symbol
7
DC PEM LEDs
4
DC PEM earth ground lug
8
DC PEM terminal and plastic cover
273687
1
2
4
3
5
6
7
1
8
Page view 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 39 40

Comments to this Manuals

No comments