Cisco Systems 8-Slot User Manual Page 54

  • Download
  • Add to my manuals
  • Print
  • Page
    / 182
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 53
2-22
Cisco CRS Carrier Routing System 8-Slot Line Card Chassis Installation Guide
OL-6256-17
Chapter 2 Installing and Removing Power Components
How to Install or Remove Fixed Configuration Power Components
Installing a DC PEM or AC Rectifier
This section describes how to install a DC PEM or AC rectifier in the Cisco CRS 8-slot line card chassis.
For information on the difference between the power types, see the “DC Power Systems” section on
page 2-6 and the AC Power Systems” section on page 2-11.
The DC PEM or AC rectifier is installed into the front of the chassis, and mates with the PDU that is
installed on the back of the chassis (see the “Installing a PDU” section on page 2-15 for information).
Although there are differences among the different DC PEM or AC rectifiers (AC Wye, AC Delta, and
DC), they are installed in the same manner. (Figure 2-12 shows an AC Wye rectifier for reference.)
Figure 2-12 Fixed Configuration AC Wye Rectifier
Prerequisites
Before performing this task, make sure that the PDU has been installed (see the “Installing a PDU”
section on page 2-15) and remove any cosmetic covers.
Required Tools and Equipment
You need the following tools and part to perform this task:
ESD-preventive wrist strap
6-in. long number 1 Phillips screwdriver
Fixed configuration power module
AC rectifier Cisco product number CRS-8-AC-RECT=
DC PEM Cisco product number CRS-8-DC-PEM=
1 Power switch 3 Handle
2 Module air filter 4 Captive screws
P
O
W
ER
O
K
FLT
A
C
FA
IL
CB
T
M
P
LL
M
O
T
122286
3
1
2
4
Page view 53
1 2 ... 49 50 51 52 53 54 55 56 57 58 59 ... 181 182

Comments to this Manuals

No comments